A development of eight new homes in Teversal, began on site in December 2025. Despite challenging winter conditions and heavy snowfall at the start of the year, progress never stalled. By January, two homes were fully completed, with site programming kept firmly on track.
This was made possible by the use of Häuser timber frame, which proved its value in demanding conditions.
Why Timber Frame Over Masonry in Winter
Even in snow, timber frame construction offers clear advantages over traditional masonry:
- Dry construction – panels are manufactured off-site, avoiding weather delays
- Rapid erection – homes can be made watertight in days, not weeks
No reliance on curing – unlike brickwork, timber frames aren’t affected by freezing temperatures
- Improved programme certainty – reduced risk of weather-related downtime
Under these conditions, a masonry build would have faced significant delays. Timber frame ensured momentum was maintained despite the bleak Nottinghamshire weather.
The builder selected Häuser Option C, a high-performance closed-panel timber frame system designed for modern, energy-efficient housing. Option C includes:
- Factory-fitted high levels of insulation within walls
- Excellent airtightness performance, reducing heat loss and energy demand
- Low U-values that comfortably exceed Part L Building Regulations
- A system engineered for sustainability, speed, and consistency of quality
The homes not only meet but go beyond regulatory energy standards, delivering long-term value for homeowners and developers. In a difficult market, this higher-performing specification:
- Maximises sales values
- Reduces future running costs for buyers
- Sets the development apart from local competition
This project clearly demonstrates how timber frame construction—when paired with a robust system like Häuser Option C—can overcome site challenges, protect build programmes, and deliver homes that are efficient, sustainable, and commercially competitive.